I promised to send a worked-out costing for going with Jump. Things which need to be included: Hosting in a proper datacentre[0] Space charges[1] Power charges External internet connection (at least one for each infrastructure server) [2] Bandwidth charges [3] Intra-rack connectivity if expand to multiple racks Physical rack cabinet PDU-controlled socket for each machine Backups[4] Remote serial console access to infrastructure servers Sysadmin on contract basis Assumptions: Space and power: 2 infrastructure servers at 2U and 200VA (~=200W) each 24 test servers at 1U and 200VA each 1 internal switch at 1U, 100VA 1 external switch at 1U, 100VA For a total of 30U, 5400VA Bandwidth: Total external 4Mbit/s 95%ile. Contract sysadmin 80h setup over two weeks, one week spent onsite 5h per week ongoing Things NOT included: Servers, testbed systems Internal switches Internal CAT-45 wiring Multi-port serial boards Serial leads The proposal would involve the following invoice line items from Jump: * "Standard colo" total power 5300VA (we don't need to budget for the external switch): L3975/month, no setup fee. * "iSCSI" backup storage one 1Tb unit: L25/month, no setup fee. * Consultancy L50/hr, 80h setup, 5h ongoing: L5000 setup, L1083/month. * Consultancy mileage: 5x Cambridge to London (60mi) and back ie 500mi at 0.40: L200. Bottom line: Total L5083/month, L5200 setup. At the current exchange rate of US$1 = UKL0.58392, that's $2968/month, $3036 setup. Notes: The power budget above is probably an overestimate, perhaps by a factor of two or so, so the bottom line I have quoted is a maximum. Jump have said that they if we commit to 2000VA at their current prices for a 3-year term, they can offer us a dedicated rack. If we don't have certainty of funding for a 3-year term we can probably negotiate a shorter term with a higher commitment. Ian. [0] In this case, Telehouse in London Docklands [1] Jump do not actually charge separately for space. [2] Jump actually offer two connections per server. [3] Jump bundle 4Mbit/s 95%ile _per server. [4] I have costed this based on backups of the infrastructure servers being done to Jump's iSCSI facility, with the machinery on our servers set up on a consultancy basis by Jump. _______________________________________________ Wg-test-framework mailing list Wg-test-framework@xxxxxxxxxxxxxxxxxxxx http://lists.xenproject.org/cgi-bin/mailman/listinfo/wg-test-framework
|
Lists.xenproject.org is hosted with RackSpace, monitoring our |