= Attendees =
Paul George
Don Koch
Lars Kurth
Ian Jackson is on vacation
= Agenda =
== Baroque[0|1] ==
Paul: Issues with motherboard fixed. Intel was very pro-active and sent out a new motherboard almost immediately.
Paul: Both machines are bench tested and back in the COLO
Lars: Are these ready to be handed back to Ian for commissioning testing
Paul: Yes
ACTION (Ian): run commissioning tests
== Dell Osoleta [0|1] ==
Paul: Had conversations with Dell. Dell is in the process of reproducing, but have not managed to do so
*Continue engaging with Dell until we resolved the issue*
== Acceptance ==
Paul: was asking how we close the set-up contract, now as almost everything is in place
ACTION (Lars): to talk to Ian when he is back and also raise with the Advisory Board
== COLO Bandwidth Issues ==
Lars: I saw a mail related to a COLO Bandwidth issue
Don: Bandwidth is saturated, get low ping times
Lars: Paperwork on how much bandwidth we should get is not specific (aka no mention of throughput)
ACTION (Lars): To ping EarthLink related to how much bandwidth we procured and look at options
Paul: offered to talk to EarthLink network guys first
ACTION (Paul): to talk to EarthLink guys and report back to the list