Paul L. George(Office) writes ("Project Status Report Update "):
> Status Report

Thanks.

> [lots of stuff to do with test servers]

Great, thanks.

> We removed the Newcastle Comtrol controller, Cable and Patch Panel
> and replaced with the repaired components.  We connected the serial
> ports to the same patch panel ports that were connected to
> Newcastle.  We connect new castle to port 32 for testing purposes.
> The damaged components will be sent back to Comtrol Monday for
> repair.
> 
> DonK was having some trouble with the serial connections so I will
> check the connections and run the diagnostics on all the path panel
> ports with the loop back plug.

OK.

Any news on connecting the switches and the PDUs to the serial
concentrator ?

> We are still waiting for the MSI team to get us a new BIOS to configure the
> serial port as console.

Should we follow this up with AMD again or are you chasing them ?

Thanks,
Ian.

_______________________________________________
Wg-test-framework mailing list
Wg-test-framework@xxxxxxxxxxxxxxxxxxxx
http://lists.xenproject.org/cgi-bin/mailman/listinfo/wg-test-framework


 


Rackspace

Lists.xenproject.org is hosted with RackSpace, monitoring our
servers 24x7x365 and backed by RackSpace's Fanatical Support®.