[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] Re: [Wg-test-framework] Project Status Report Update
Paul L. George(Office) writes ("Project Status Report Update "): > Status Report Thanks. > [lots of stuff to do with test servers] Great, thanks. > We removed the Newcastle Comtrol controller, Cable and Patch Panel > and replaced with the repaired components. We connected the serial > ports to the same patch panel ports that were connected to > Newcastle. We connect new castle to port 32 for testing purposes. > The damaged components will be sent back to Comtrol Monday for > repair. > > DonK was having some trouble with the serial connections so I will > check the connections and run the diagnostics on all the path panel > ports with the loop back plug. OK. Any news on connecting the switches and the PDUs to the serial concentrator ? > We are still waiting for the MSI team to get us a new BIOS to configure the > serial port as console. Should we follow this up with AMD again or are you chasing them ? Thanks, Ian. _______________________________________________ Wg-test-framework mailing list Wg-test-framework@xxxxxxxxxxxxxxxxxxxx http://lists.xenproject.org/cgi-bin/mailman/listinfo/wg-test-framework
|
Lists.xenproject.org is hosted with RackSpace, monitoring our |