Paul L. George(Office) writes ("[Wg-test-framework] Status Report 12-23-14 to
01-14-15"):
> We were able to install the servers that we had tested and rearrange
> the server cabinet so that the server and components are placed in
> the order that you wanted.
Thanks.
> I will construct a spread sheet that will show the configuration and specify
> the switch ports, Comtrol ports and PDU positions for each server.
Great, thanks. That will make it convenient to load the data into our
test software database.
> All the servers that had been delivered ? 18 in all, we are still
> waiting for 8 servers (4 Sets).
Right.
> All the servers have been labeled with their name and item #
Thanks.
> The PDU?s have not been configured yet but we are targeting that to happen
> this
> week as well. We need to download an APC tool to access the PDU?s web
> interface.
I'm surprised that's necessary. I have an APC PDU under my desk and
was able to do all the needed configuration via the serial interface.
Have you tried talking to the serial interface ?
> The outstanding problems with MSI BIOS for Rimava 0,1 are still
> outstanding, it appears that MSI took 2 weeks off for the holiday
> also.
Heh.
> The VLAN setup for infrastructure and test are setup but the tagged
> ports are not working the way you wanted them to work. Chris is
> trying to come up with a configuration that will function the way
> you want.
Thanks. Please do have Chris get in touch with me directly if he
feels it would be of any use.
Thanks,
Ian.
_______________________________________________
Wg-test-framework mailing list
Wg-test-framework@xxxxxxxxxxxxxxxxxxxx
http://lists.xenproject.org/cgi-bin/mailman/listinfo/wg-test-framework
|
![]() |
Lists.xenproject.org is hosted with RackSpace, monitoring our |