|
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] Re: [Xen-devel] [OSSTEST Nested PATCH v11 6/7] Compose the main recipe of nested test job
Ian Campbell writes ("Re: [OSSTEST Nested PATCH v11 6/7] Compose the main
recipe of nested test job"):
> I'll leave it to Ian to suggest a solution since it will no doubt
> involve some tcl plumbing (I'd be inclined to record 'hosts which are
> actually guests' somewhere and have the infra clean them up
> automatically after doing leak check and log collection).
Thinking "aloud":
The things we want to happen at the end of the job are:
* leak check on the l1
!* logs capture on the l1 (might involve "power cycle")
* destruction of the l1 on l0
* leak check on l0
!* logs capture on l0
The items marked ! should happen even in case of failure.
This is going to be quite fiddly to do in a generic way. But on the
other hand, doing it in a generic way would avoid writing an explicit
error handler in the l1 test case code, and replicating the "per-host
operations".
> I was thinking more along the lines of creating Osstest/PDU/guest.pm
> with the appropriate methods calling out to toolstack($l0)->foo, setting
> $ho->{Power} = 'guest $l1guestname' somewhere and allowing
> power_cycle_host_setup to do it's thing.
Yes, that's what I meant.
Ian.
_______________________________________________
Xen-devel mailing list
Xen-devel@xxxxxxxxxxxxx
http://lists.xen.org/xen-devel
|
![]() |
Lists.xenproject.org is hosted with RackSpace, monitoring our |